DECISION SUPPORT
Compare architectures, not marketing labels.
Use this matrix to understand where each configuration fits before model-level engineering review.
| Decision factor | Open Set | Silent Set | Containerized | Parallel Multi-set |
|---|---|---|---|---|
| Typical environment | Plant room / controlled area | Outdoor / acoustic-sensitive | High-capacity outdoor | Critical / scalable power |
| Acoustic treatment | By room/project | Integrated enclosure | Project engineered | Depends on packaging |
| Deployment complexity | Medium | Low–Medium | Medium–High | High |
| Controls | Standalone / ATS | Standalone / ATS | ATS / project controls | Synchronization + load sharing |
| Scalability | Limited | Limited | High | Very high |
| Engineering review | Required | Required | Required | Critical |
